Needing a 4 metre join smoothed out from the concrete floor in our downstairs rumpus room. We will be putting underlay and carpet over the top so doesn't need to look perfect just needs to be smoother than it currently is. Prefer done soon. Thanks.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 09-05-2021
Tradesperson reply
"Was really good dealing with owner , good communication"
Partner with Builderscrack
Get work