Need a contractor to re-concrete part of an existing driveway. The new driveway has to be formed so that water runs away from the block wall and away from the front sliding gate where water previously gathered. It also needs to match the existing concrete in the parking bay (to the right of the driveway), which was laid approx 18 months ago. The new concrete area measures approx 8.6mx3.2m.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
3.0
|
Work carried out by the owner/operator
Reviewed on 04-12-2019
Partner with Builderscrack
Get work