1. Remove old concrete footpath. 2. Excavate & box (soil can be dumped on site). 3. Build new 100mm reinforced concrete path/slab on basecourse to drawing provided (Approx. 12m²). 4. Make sawcuts where necessary. Please see drawing and photos, thanks!
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Asi and crew did a great job and were a pleasure to deal with. Good communication during the job to get the result we wanted. Thanks Hector's Concrete.
Work carried out by the owner/operator
Reviewed on 23 November 2016