150mm deep - steel reinforced concrete slab required to be boxed with concrete poured and floated off. ( 6.8m x 3.5m + 2.1m x 1.2m) Soil will be dug out by owner to required depth, with slab to be poured in dirt area between deck and side wooden garden bed. Access to rear yard via back door for double garage . Slab needs to be poured by the end of January 2022 - but will be dug out by the end of this week (so could be poured this side of Christmas - if that was an option)