Concrete poured and floated for car port floor, 6x6 meters. Will already be boxed.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Justin is clearly very particular about his end result and wanted to ensure the preparation was of a high standard before proceeding with the concrete pour. Both he and his colleague who assisted with the job were pleasant and completed the work to a high standard.
Work carried out by the owner/operator
Reviewed on 07-10-2021
Partner with Builderscrack
Get work