Needing concrete/hard waste removed and a piece of concrete cut and removed from an existing fence. Photos attached of the pile that needs removing and the Long piece of concrete that needs cutting and removed. The concrete that needs cutting is long piece to the right of the pavers and it runs under the pile to the tin fence. Concrete is Approx 200-300mm deep.
#1 | Tradie 1 |
|
58 jobs | No longer in contact |
#2 | Tradie 2 |
|
211 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work