Hi We require foundations/house pad to NZ3601 (plans have been drawn/submitted to council) for a 132m2 steel frame 3 bed house & separate garage pad 36m2. Council flood requirements need to raise ffl 400mm above existing site level. Engineers geo report advises a 200mm top soil removal before hard fill is added
#1 | Tradie 1 | No recent reviews | 7 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
30 jobs | No longer in contact |
#4 | Tradie 4 |
|
77 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work