Either concreting or paving, looking to discuss options. Path to be 900mm wide and 6640mm long, approximately. Path will lead from beside / 900mm in front of the garage down to the back of the garage and the woodshed, connecting with the existing pavers down there. Anytime within the next month or two would be preferable.
#1 | Tradie 1 | No recent reviews | 5 jobs | No longer in contact |
Partner with Builderscrack
Get work