concrete slab

Job description

House Slabs
Tauranga

i have an area approx 5mts by 4 mts with multi directional water flow direction (so the water dosnt flow under the house when it rains)


Review

Workmanship
1.0
Cost
5.0
Schedule
5.0
Communications
4.0

Wrk was completed concret slab was laid in wrong direction so instead of water flowing away from the house it know flows and pools against house the solution was to cut a grove to drain (not nice) We will have to cut out a strip and put in a drain to slove this issue .when asked to do this to repair we where told this would cost to much but after some heavy rain the grove cut in is not wrking and we will have to fott the bill and have a proper drain laid under the concret slab .

Work carried out by an employee of the company
Reviewed on 15-06-2022

Verified Builderscrack review