Private residence built on concrete slab. Job could be over 250m2, but would like a test over a 1 or 2 m2 patch that contain a crack and nail hole or other chip that need to be addressed (with epoxy or a filler?) on the full job. Need to assess what the final result will look like from the test. Carpet was nailed down to concrete on perimeters and some thin settlement cracks.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by an employee of the company
Reviewed on 01-03-2020
Partner with Builderscrack
Get work