A portion of our backyard - We need to have concrete laid and finished with a slight slope so water runs off to the grass. The total area would be about (a rough measure only) 20 sq.m. Concrete to be about 100ml deep. No mesh needed. We have prepared the ground and boxed in the area. Once you look at it and discuss, we will put in crusher and/or sand as a foundation bed. Your job will be to concrete the area to a high standard of workmanship, so it is a good quality job - strong, well laid concrete, looking good and well surfaced, with a gentle slope for water to run off into the grass. Thank you and regards.
#1 | Tradie 1 | No recent reviews | 34 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work