I have a total span design which is 10500 x 9000 that has received building consent from Taupo District Council. Site works (cut, dig out topsoil and level building platform, place and compact 25 tonne of pumice hard fill) will be completed prior to you laying the slab. I need for someone to box and poor concrete slab - Polythene under slab to create a moisture barrier - 665 mesh reinforcing to slab with D16 rod to Perimeter footing - 100mm thick 20MPa Concrete slab with saw cuts - Leave a conduit or two in the slab for electrical and comms (I will supply)
Partner with Builderscrack
Get work