Needing foundation work for a 3.3mx3.3m wood cabin sourced from trade tested. Flat farmland, so minimal clearing needed, just levelling. Quote with different foundation options preferable (e.g. piles vs concrete). Timetable would be early July.
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work