We have a garden shed that is bolted to a flat slab of concrete, meaning that water seeps in under the edge of the shed. I want an additional 50mm layer of concrete poured inside the shed to stop the water seeping in. The shed is 2 x 3 metres - so just .3 metres of concrete?
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very prompt, great price, good workmanship and very pleasant to deal with. Highly recommended! Thanks Val!
Work carried out by the owner/operator
Reviewed on 16-08-2016
Tradesperson reply
"Thanks for everything. "
Partner with Builderscrack
Get work