A new driveway, about 30m long with a turnaround at the end, required in taharangi st.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
3.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 03-09-2022
Partner with Builderscrack
Get work