Active job

Stillwater Crescent Pathway

Job image
Job image
Job image
Job image
Job image
Job image

Job description

Concrete Cleaning
Rodney

1 m wide x 20 m long exposed aggregate concrete path. See attached photos. All lines are indicative only. The path would be 1 metre wide and start at the top gravel driveway. Ideally, it would curve around as indicated to reduce the steep incline and then curve around, passing the garden shed and finishing at the northwestern corner of the new house. Add more soil to the path as it passes the western deck to reduce the steepness of the incline. Some H5 tanalised wood would have to protect the deck from the added soil. Use the earth removed from the orange area in the last photo that needs to be dug out in preparation for building a new deck. We are replacing the deck around the house and will extend it to the northwestern corner of the house to meet up with the concrete pathway. So to repeat.... 1 meter wide path. All lines on the photos are indicative only. Reduce the incline around the western deck area by adding more soil dug out from the northwestern end of the house, marked in orange in the last photo, which would have to be dug out to about a depth of 200 mm.


Trade professionals

#1 Tradie 1
65 jobs No longer in contact
#2 Tradie 2
16 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo