Shed floor not deep enough for 2 post car hoist to be bolted to. Two 1500 x 1500 x 300 deep squares need to be cut out of existing concrete floor, new rebar to be fitted and tied into existing floor. New concrete to be pored and leveled. Hoist will be removed and floor will be marked before contractor starts job. Kaiwaka location.
#1 | Tradie 1 |
|
57 jobs | No longer in contact |
Partner with Builderscrack
Get work