Carry out groundworks including drainage and lay 20 mPa slab in preparation for erection of Skyline Workshop (6.0m x 7.8m). Groundworks include addition of Punched Novacoil to existing gully and fill as well as trenches for electricity and H&C water supply to proposed workshop. Drainage includes addition to existing septic waste for new WC. Reasonably level site already.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 8 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 2 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work