1, PATIO SLAB approx 29 msq patio slab with 2x step coloured black oxide to match existing concrete slabs . form work and retaining wall perimiter and steps form work in place, mesh will also be installed light brush finish to match existing concrete patios 2- WORKSHOP RIB RAFT SLAB 10 Msq (3.3m x3.0m ) workshop rib raft slab with 300mm footing around perimeter and 300mm W central rib , 200mm thick poly slab will be installed. Form work, mesh and rebar starters will be installed due to location of concrete work at back of section down right of way drive way (approx 40m) , pump truck maybe considered as i don't want the existing concrete slabs to have concrete spilt on them and pumping will speed up the pour estimated quantity of concrete 5 Mcu
#1 | Tradie 1 | No recent reviews | 19 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 15 jobs | No longer in contact |
#3 | Tradie 3 |
|
270 jobs | No longer in contact |
#4 | Tradie 4 |
|
121 jobs | No longer in contact |
Partner with Builderscrack
Get work