I need a room 6m x 6m and a passage way 3m x 1.5m surface levelled and top coated with concrete to make ready for wall to wall carpeting. There is a small ridge about 1cm in height across the floor that needs to be grind down. This needs to be completed before next wednesday 6th June to make ready for carpet fitters and movers on 7th June. See pictures for layout.
#1 | Tradie 1 | No recent reviews | 21 jobs | No longer in contact |
Partner with Builderscrack
Get work