Concrete laying, Pod floors. Pumped

Job description

House Slabs
Rodney

First of several pod flood slabs for a group or new houses. Small and easy 94m2. boom pumped.


Review

Workmanship
3.0
Cost
2.0
Schedule
1.0
Communications
1.0

I arranged with Chris that he would pour the 2nd house floor 10 Days before the actual agreed date. The day before he txt me and said he was unable to do the pour tomorrow. I had all the concrete trucks and boom pump all ready booked for a early pour the next day and Chris let me down totally. The Concrete Professional is NOT TO BE TRUSTED.