I have a 16 sqm slab to be poured, approximately 4.5m3.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 08-07-2022
Partner with Builderscrack
Get work