At the top of our drive we need an area aprox 12 m x15m boxed and leveled to concrete. The base is lime stone on top of stones, the slab will be on apox ,, 10-12 degrees slope. There is a storm water drain at the bottom all done.
#1 | Tradie 1 |
|
112 jobs | No longer in contact |
#2 | Tradie 2 |
|
26 jobs | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work