Published on 13 April 2023
Footpath has been prepared to receive concrete. The needed work is to pave the footpath with premixed concrete, complete with proper sloping, brush finish and cut joints. Total volume of concrete you need to order is 1.2 cu.m.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Jesse was a good natured person, accompanied his 7-year old kid with him which was a distraction. Not focused on details. Had to called him back to rectify one small area. He was happy to oblige. Final work was good, overall. Happy with the result.
Work carried out by the owner/operator
Reviewed on 26 June 2023
Partner with Builderscrack
Get work