There are two areas needing concrete. First is small infill where a bathroom drain was installed and had a section cut out from existing slab to make way. Second is putting in a level slab where external steps have previously been removed. This will require a bit of formwork.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ratings say it all, Daniel was excellent to deal with and did an excellent job.
Work carried out by the owner/operator
Reviewed on 18-06-2022
Partner with Builderscrack
Get work