Concrete layer - 1 person approx 2 hrs work. Date required: 1st July 21 - 11am to 1pm - concrete truck booked for 11h30. Need extra pair of hands to lay, screed and finish 2.7m (length) X 1.2 m (wide) X 0.4m (high) concrete pad ( 1.5 m3) - it is the base for a concrete fire place. Boxing will be ready with re-bar and I will assist moving concrete via wheelbarrow from truck to boxed slab area while layer works laying/finishing pad. Layer to bring own tools to screed and finish top of pad. Happy to neg price.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Malakai - arrived early and did a great neat job
Work carried out by the owner/operator
Reviewed on 18-08-2021
Partner with Builderscrack
Get work