Excavate top soil and dispose, source, lay and compact gap, then form and lay concrete path. Minor gradient on larger southern path with some slopping required for drainage. Includes some shaping of water flow for outdoor shower (vitex step will be removed first). Edge of path timber edge so small 20 - 30 cm garden bed along black fence can be planted and also assist run off. Front path and southern side path (largest) has small digger access - ideally use ply or matts to protect lawn and driveway. Front path to match path on RHS at front of bungalow. Concrete exposed aggregate to match driveway. Path sections are: 23.5m * --- sq m , --- sq m, --- sq m, --- sq m For total of 51 sq m approx. other path is about 12 cm thick, but will look for your recommendation.
#1 | Tradie 1 |
|
65 jobs | No longer in contact |
#2 | Tradie 2 |
|
270 jobs | No longer in contact |
#3 | Tradie 3 |
|
15 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
10 jobs | No longer in contact |
#6 | Tradie 6 |
|
26 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work