Need the concrete block wall cut shorter to make an easier turn into the driveway. One vertical cut, and one horizontal cut at the base. I will dig around the base, only cutting is required.
#1 | Tradie 1 |
|
38 jobs | No longer in contact |
#2 | Tradie 2 |
|
121 jobs | No longer in contact |
#3 | Tradie 3 |
|
105 jobs | No longer in contact |
#4 | Tradie 4 |
|
56 jobs | No longer in contact |
Partner with Builderscrack
Get work