I have a raised deck which serves as carport. The floor needs concrete to be placed but the concrete must also be extended to connect with the existing driveway.. I have already dug out where the concrete is required. I then filled the area with GAP20 (I think) and compacted it. I also went ahead, boxed the area and placed steel mesh over the whole area. All that remains is for a concrete placer to neatly pour concrte over the whole are and smoothly finish it off. I guess the concrete arae is about 40 square metres. Thanks