Put a new driveway instead of existing two gravel strips. The length of driveway is 35 m
Workmanship |
2.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
3.0
|
Work carried out by the owner/operator
Reviewed on 19-02-2013
Partner with Builderscrack
Get work