Concrete right of way and drainage

Job description

Concrete Driveways & Paths
North Shore

A concrete driveway approximately 30 metres long is to be removed and replaced with a concrete driveway to Auckland Council Right of Way standard. i.e. 3m metres wide 150mm thick. Approximately 40 metres of trenching is required through the existing driveway for stormwater piping and associated cesspit and connection to the council stormwater system.