To lay concrete to form foot paths and three concrete steps. Boxing and all forming work has been done, already for job to be done. Measured amount of concrete required is 4 cubic meters.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Walter is one of the best tradesmen I've had do some work for me. He was friendly, turn up on time did an excellent job. Am very happy with what was done, would HIGHLY RECOMMEND Walter for any one that is looking for a concrete layer.
Work carried out by the owner/operator
Reviewed on 09-08-2017
Partner with Builderscrack
Get work