We have an old concrete footing coming 250 off the outside wall of my house. Its 600 deep and 600 long. We need to run a small concrete line/footing under it as there is soil between the new work either side...hence the water in the inner wall lining.
#1 | Tradie 1 | No recent reviews | 60 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 15 jobs | No longer in contact |
Partner with Builderscrack
Get work