We have built an open walled pavillion with 8 posts sunk into it and just require now a concrete slab approx 4.5 x 4.5m. We will be tiling over the top of the slab at some stage. Note: the 8 posts are within this slab approx 250mm in from each edge. (Ignore the broken concrete in the picture, this will be removed in order to make way for a the box frame and pour.)
#1 | Tradie 1 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work