Require a concrete pad laid. 4.2 x2.4, depth 100 mm for 600kg portable cabin. Job includes prep of area which is reasonably level.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Top notch team. Despite the chaos with flood damage in his community, WIp arrived when he said he would, and the job was completed to a high standard. He is a hard worker and his work ethic is reflected in his team. Would recommend without hesitation.
Work carried out by the owner/operator
Reviewed on 05-03-2023
Partner with Builderscrack
Get work