Active job

laying concrete pad and taking old concrete away

Job description

New Concrete Foundations
Napier

I have a 6.1mt by 3.3mt by 150 deep pad I need to be done I have already ripped up the old concrete and I can get the mesh to go into it if you want


Trade professionals

#1 Tradie 1
7 jobs No longer in contact
#2 Tradie 2
1 job No longer in contact
#3 Tradie 3
4 jobs No longer in contact
#4 Tradie 4
0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo