I have a 6.1mt by 3.3mt by 150 deep pad I need to be done I have already ripped up the old concrete and I can get the mesh to go into it if you want
#1 | Tradie 1 |
|
7 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
4 jobs | No longer in contact |
#4 | Tradie 4 |
|
0 jobs | No longer in contact |
Partner with Builderscrack
Get work