Immediate Job available to complete 1) Site works dig out 370mm H (250mm below ground level) x 300mmW x @ Diam 7.5m 2) 200mm of compacted hard fill trough the center (Diam @7m x 200mm deep 3) Outside footing to be boxed, materials to by supplied by you and installed , lay and tie reinforcing (we can supply reio), concrete poured and finished includes the footing and the inside to have a full concrete floor 100mm deep with mesh poured at the same .time .
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
Partner with Builderscrack
Get work