Published: 13 November 2023
Hi. You are required to dig 100-150mm of the earth to prepare the place, formwork for concreting, prefer if possible, use mesh and pour a 30m2 concrete foundation for the shed and about 10m2 footpath to it. That will be in the backyard about 30-40 m from the front end. The excavator is not possible to use.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I am happy with their work. Fast to reply and knows what to do. Unlike other companies who asked to borrow buckets, spades, etc, Auckland Earthworks was fully equipped with all the tools required. They clean up after and are reasonably quiet in the process. It was as smooth as it could be. They will be the first to go if I need to do another job. And their price was much better than others.
Work carried out by an employee of the company
Reviewed on 21-02-2024
Tradesperson reply
"Thank you for the kind words. It was a pleasure working at your place."
Partner with Builderscrack
Get work