Published on 13 October 2023
We have an existing front path from our driveway to our front deck. At the front of the path, it is paving blocks held in place by wooden half rounds. The current step is too high and we have elderly people coming for Christmas so we need to have a concrete step made that is lower than the existing height - make it 1/2 the existing height. Dimensions are on the photo.