I require the construction of a gravel base foundation for a future shed that will be approx 3m x 3m or perhaps 3.2 x 2.8 (at this point, the shed sizing may change a little). So the gravel foundation will extend outside of the shed measurements Time frame. In the next 6 - 8 weeks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by an employee of the company
Reviewed on 03-03-2022
Tradesperson reply
"Thank-you Luke. I appreciate your business.