Concrete cut and removal. 62M2 at 100mm thick. Job to be done early August. Access via steps to the road. Concrete is cracked and sunken and requires removal for deck to be built.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job.
Work carried out by the owner/operator
Reviewed on 08-10-2021
Partner with Builderscrack
Get work