Hi, we are a mechanical workshop and need a 10m2 job in our workshop. Current depth is 90ml and that needs to be taken out (10m2) and then 200ml laid in (10m2).
#1 | Tradie 1 | No recent reviews | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 3 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 174 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 16 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work