Review

Large formed concrete planter

Job description

Placing & Formwork
Manukau

We are building a low deck and I would like the deck to be edged with a concrete planter (no base - directly on ground) 8m x 1 - internal, approx 600mm height on deck side . I would like the concrete to have a neat finish and coloured if possible. There is a slight slope- maybe 15 degrees - so we need to know what prep work needs to be done and obviously a quote to do the work and if at all possible - photos of something similar that you have done


Review

Workmanship
1.0
Cost
3.0
Schedule
1.0
Communications
2.0

We were obliged to ask them NOT to come back. Completion timeframe was 4-5 days. After 3 weeks, all we had were some shoddily laid footings that weren't level and were bulging because the boxing wasn't supported while concrete was poured. This was after 3 botched attempts at laying out the footings . Ben was polite enough and had some health issues over this period, which delayed him by a week. We had paid $2300 deposit & have yet to receive the itemised account of expenses we requested.

Work carried out by the owner & subcontractors
Reviewed on 14-04-2016

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo