10m x 7m meter pad, strong enough to handle 2T forklifts, needs ground work done and boxing up at one end to make it level, i have not put a level over it, but i estimate it has about 400mm fall over the 7 meter length current area is gravel. It is an extension of the concrete pad already in the photos and extends straight towards the dam
#1 | Tradie 1 | No recent reviews | 70 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 6 jobs | No longer in contact |
#4 | Tradie 4 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work