Need to make holes or crack concrete pond base to allow full drainage. Remove top brick and concrete ring to a bit below grass level so in can fill it in and grass it over. Pond is 4m diam . About 60cm deeo
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 09-06-2022
Partner with Builderscrack
Get work