This is not a small job. There is subsidence in a part of the driveway which is causing an old concrete retaining wall to crack as well. I suspect full removal, piling and compacting and laying new concrete is required but won't really know until old driveway, wall and blocks are removed. I would say 30-40 square metres of driveway to removed. Small truck and digger access.
#1 | Tradie 1 | No recent reviews | 16 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 36 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work