I have a concrete slab (2m x 1m) left over from a fireplace that I need jack hammered down by about 100mm. I then need some floor leveller applied so we can put floorboards over the top to match existing boards.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Really happy with the job.
Work carried out by an employee of the company
Reviewed on 14-08-2016
Partner with Builderscrack
Get work