I attach plans with length and width. Requires a gradient to "kerbing" to channel storm water to rear soak pit of the drive. Probably various ways of doing this and open to suggestion. Asphalt drive ( but would consider concrete if considered more economic ). To reduce travel cost would be prepared to wait to join with other jobs in the area. The quote should be for drive from the gate boundary. Council covering cost of footpath portion.
#1 | Tradie 1 |
|
90 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 6 jobs | No longer in contact |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work