I need to have a 40mm hole drilled through the corner of a concrete pad for a gas pipe to go through. It will need to be angled through the bottom plate to break through about 300mm below. It is a new block foundation with framing and Rab board already in place.
#1 | Tradie 1 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work