Published on 26th May 2022
Require a concrete slab to be laid on existing concrete. Job to be completed as soon as possible.
Slab to be approximately 450mm x 700mm and 130mm thick.
Slab to be up against bottom concrete step and require the step to be leveled with new concrete as it is currently on a slight slope.
Refer to attached photo - new concrete slab area highlighted in red, and part of existing concrete step that needs to be leveled highlighted in green.
The area will be used for positioning a new hot water cylinder which can weigh up to 300KG, so new slab needs to be strong enough to hold the cylinder.
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
4.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Really impressed with Ox Crete. Professional service. Excellent communication and impressive workmanship. Will definitely use again."
Work carried out by the owner/operator
Review posted by Geoff on 1st July 2022
"Thanks very much for your review."
1st July 2022
Verified work review
Partner with Builderscrack
Get work